Program/Plan Action Summary
With the exception of the
ACTV, all Program Actions must be accomplished by adding a new Effective Dated
Row (clicking the ‘+’ button) on the Student Program tab.
|
Scenario |
Program Action |
Process Summary |
Notes |
|
Adding a Plan into an existing Program |
PLNC (Plan Change) |
Find existing Program. Add Plan. |
Use the ‘+’ button to add a new row in the Student Plan tab. |
|
Adding a Plan into a new Program |
ACTV (Activate) |
Add New Value. Add Program and Plan. |
Create a new Program and Plan. |
|
Replacing a Plan to a Plan within the same Program |
PLNC (Plan Change) |
Find existing Program. Change Plan. |
Overwrite the existing data in the newly created Effective Dated Row. |
|
Replacing a Plan to a Plan in a Different Existing Program |
1. PLNC (Plan Change) |
1. Find target existing Program. Add new Plan. |
New Plan is added first to ensure student has at least one active Plan at all times. |
|
|
2. PLNC (Plan Change) or DISC (Discontinue) |
2. Find original existing Program. Remove original Plan. |
Plan Change is used when multiple Plans exist in Program. If the originating Plan is the last in the Program, the Program is Discontinued. |
|
Replacing a Plan to a Plan in a New Program (Single Plan in Original Program) |
PRGC (Program Change) |
Find existing Program. Change Program and Plan. |
Overwrite the existing data in the newly created Effective Dated Row. |
|
Replacing a Plan to a Plan in a New Program (Multiple Plans in Original Program) |
1. ACTV (Plan Change) |
1. Add New Value. Add Program and Plan. |
New Plan is added first to ensure student has at least one active Plan at all times. |
|
|
2. PLNC (Plan Change) |
2. Find original existing Program. Remove original Plan. |
Use the ‘-‘ button to remove the existing Plan from the Student Plan tab. |
|
Adding a Sub-Plan into an existing Plan |
PLNC (Plan Change) |
Find existing Program. Add Sub-Plan. |
Use the ‘+’ button to add a new row in the Student Sub-Plan tab. |
|
Adding a new Sub-Plan |
ACTV (Activate) |
Add New Value. Add Program, Plan and Sub-Plan. |
Create a new Program, Plan and Sub-Plan. |
|
Replacing a Sub-Plan |
PLNC (Plan Change) |
Find existing Program. Change Sub-Plan. |
Overwrite the existing data in the newly created Effective Dated Row. |
|
Dropping the only Plan in a Program |
DISC (Discontinue) |
Find existing Program. Discontinue Program. |
Dropping the only Plan from a Program is the same as Discontinuing that Program. |
|
Dropping a Plan with other Plans in Program |
PLNC (Plan Change) |
Find existing Program. Remove Plan. |
Use the ‘-‘ button to remove the existing Plan from the Student Plan tab. |
|
Dropping a Sub-Plan |
PLNC (Plan Change) |
Find existing Program. Remove Sub-Plan. |
Use the ‘-‘ button to remove the existing Sub-Plan from the Student Sub-Plan tab. |
|
Adding a Plan in a Program after Degree Completion |
ACTV (Activate) |
Add New Value. Add Program and Plan. |
After a Program has been completed, any new Plan attempts in that same Program must be treated as a new Program. |
|
Changing Data (i.e., Requirement Term) about existing Program or Plan |
DATA (Data Change) |
Find existing Program. Change Program or Plan Data |
This applies to Admit Term and Requirement Term only. All other “data” changes should be addressed by Program or Plan Changes. |
|
Changing the Primary Program |
1. ACTV (Activate) |
1. Add New Value. Add existing Program and Plan, again. |
Note: The Primary Program must have the lowest active Student Career Number. |
|
|
2. DISC (Discontinue) |
2. Find existing Program. Discontinue Program. |
The effect of this process is to discontinue all Programs with a lower Student Career Number, then re-establish them with a higher number. |
|
Adding a New Program |
ACTV (Activate) |
Add New Value. Add Program and Plan. |
See “Adding a Plan into a New Program” above. |
|
Adding a New Career |
ACTV (Activate) |
Add New Value. Add Program and Plan. |
See “Adding a Plan into a New Program” above. |